Marbella · Benahavís · Estepona · Mijas

Renovating a villa on the Costa del Sol, inside and out

Detached villas, townhouses and village houses. We handle the interior, the façade, the roof and the windows as one coordinated job, so you have one person to speak to and one itemised quote to read.

  • One point of contact
  • Itemised quote
  • Materials sourced for you
  • Final clean
  • Guarantee & liability cover
Living room with floating staircase and stone wallStaircase with floating timber treadsAttic bathroom with timber vanity and mirror
One house, one person answerable.

A villa job brings together roofers, renderers, carpenters, plumbers, electricians and finishers. We set the order, buy the materials, coordinate every trade and stand behind the finished house.

How we work

From your photos to the handover walk-round

Eight stages. The outside is made sound before the inside is finished, and nothing gets closed up until it has been checked.

  1. Photos and floor area

    Send photos of the house, outside and in, and the approximate built area by email or WhatsApp for a first estimate.

  2. Site visit

    We walk the property, look at the roof, façade, windows and services, and note anything that needs a technician first.

  3. Itemised quote

    Each task on its own line, with quantity and description, and a clear note of what is excluded.

  4. Paperwork check

    We go through the type of notification the town hall usually expects for the scope, so it is clear before work starts.

  5. Envelope first

    Roof, façade and window openings are dealt with early, so new interiors are not exposed to water.

  6. Services and masonry

    Plumbing and electrics by authorised partner installers, then partitions, plastering and ceilings.

  7. Finishes

    Floors, tiling, staircases, painting and joinery, in the order that avoids damage and rework.

  8. Clean and walk-round

    Fittings installed, a final clean, then we walk round the house with you, inside and out.

Bedroom with fresh plaster and two windows

Inside, outside or both

Interior only, or the envelope too?

Many owners call about a kitchen or the bathrooms and then discover damp patches, a tired roof or windows that no longer close properly. The right scope depends on what the visit shows, not on a standard package.

An interior-only job is usually enough if…

  • the roof has no history of leaks
  • the façade render is sound and only needs paint
  • the windows close and seal well
  • there are no damp patches on outside walls

Plan the envelope as well if…

  • there are stains on ceilings under the roof
  • the render is cracked, hollow or flaking
  • you are thinking about insulating the walls
  • the window frames are old or let in draughts

Our work

Real houses, real stages of work

Photos from our own team’s jobs: floating staircases, stone feature walls, bathrooms under the roof, and the plastering and framing behind them.

Living room with floating staircase and stone wall
Living room with floating stair
Staircase with floating timber treads
Floating timber treads
Attic bathroom with timber vanity and mirror
Bathroom under the roof
Stair finished in a light tone with metal balustrade
Finished staircase
Bedroom with tufted wall panel and indirect ceiling light
Bedroom with tufted feature wall
Floating black stair treads over seamless floor
Floating stair treads
In short

We renovate villas, townhouses and village houses on the Costa del Sol, covering the interior and the envelope: façade repair, external wall insulation, roofs and windows. One contractor coordinates every trade, buys materials if you wish, works with authorised partner installers for electrics and gas, and hands the house back clean. Quotes are itemised and free; photos and the approximate built area, sent by email or WhatsApp, are enough for a first estimate.

What does renovating a villa actually involve?

A villa is a different job from an apartment. There is no community to look after the roof or the façade, so everything from the ridge tiles to the garden wall is yours. A renovation can therefore cover two layers: the interior — layout, services, bathrooms, kitchen, floors, staircases, finishes — and the envelope, meaning the roof, the external walls and the windows that keep weather out.

We plan both together, even when you only want to tackle one of them now. Knowing that the roof will need attention in a couple of seasons changes the order in which you spend money inside. Our villa renovation page explains how we scope a whole-house job.

Why deal with the roof, façade and windows before the interior?

Water always wins. A new plaster ceiling under a roof that still leaks will stain; fresh paint on an outside wall with cracked render will blister. When the envelope and the interior both need work, the outside is usually made watertight first and the inside finished afterwards.

The same logic applies to windows. Replacing frames disturbs the reveals around them, inside and out. If the plastering and painting inside are done before the new windows go in, you pay to repair the same surfaces twice. A sensible sequence is one of the main reasons owners choose a single contractor for the whole house rather than separate firms for the roof, the windows and the interior.

What is external wall insulation, and is it right for my house?

External wall insulation — called SATE in Spain, and often EWI or EIFS in English — is a layer of insulation boards fixed to the outside of the walls, then covered with a reinforced base coat and a finishing render. Because it wraps the house from outside, it does not take space from the rooms and it covers many of the cold spots where floors and walls meet.

It is not right for every house. The wall has to be sound, dry and able to take the fixings; window sills, eaves and junctions need detailing; and on a townhouse the community of owners has a say in any change to the outside. We explain the layers and the checks in our guide what external wall insulation is, and when it is not the answer in this article. We do not quote energy-saving figures: they depend on the house, the system and how you use it.

How do you approach a roof leak?

A stain on a ceiling rarely sits directly below the fault. Water travels along battens, slabs and insulation before it shows. The first step is therefore finding where it gets in: slipped or broken tiles, a failed joint at a parapet, a blocked gutter, a cracked roof-terrace membrane or a badly sealed skylight.

Many leaks are local and can be repaired. Some are a sign that the waterproofing has reached the end of its useful life, and a few point to structural movement. Where we see signs of the latter, we tell you plainly and recommend an architect or building surveyor (arquitecto or aparejador) before we touch anything. Our guide on roofs and leaks goes through the usual causes.

What is involved in replacing windows?

New windows are one of the most noticeable changes in an older villa: they affect light, draughts, noise and how secure the house feels. The job is more than swapping frames. The old frame comes out, the opening is checked and squared, the new frame is fixed and sealed, and the reveals and sills are made good inside and out.

Two practical points matter. If the size or position of an opening changes, the paperwork changes too; and on a townhouse, the style and colour of frames is often set by the community. Our window replacement page covers what to decide before ordering.

What does living near the sea mean for a house?

Salt-laden air, strong sun and wind-driven rain are part of life on the coast, and they show on the outside of a house: chalking paint, rusting balcony rails, cracked render around metal fixings. Spain’s structural code even treats reinforced concrete exposed to marine aerosols as its own exposure class, which tells you the environment is taken seriously.

For an owner, the practical consequence is regular inspection of the façade, railings, roof and joints, and repairs before small defects become water paths. Our guide on façade maintenance by the sea sets out what to look at and how often to look.

Do façade, roof and window works need permission?

Usually, yes — in some form. Andalusia’s planning law (Ley 7/2021, known as LISTA) separates works that only need a declaración responsable, a sworn notification filed with the town hall, from works that need a full licence. Municipal forms in Málaga province list façade, roof and window works as minor works, but some of them still need a short technical report signed by a qualified professional, and changing the size of an opening is treated differently from replacing a frame in the same hole.

Every town hall publishes its own forms, so we go through what usually applies to your scope before work starts (exact requirements in your municipality: to be verified case by case). We do not prepare technical projects or apply for licences on your behalf. The detail is in our guide on permits for façade, roof and windows.

Can I start the process while I am living abroad?

Yes, the first step works from anywhere. Send photos of the outside and every room, a few close-ups of anything that worries you and the approximate built area by email or WhatsApp, and we will come back with a first estimate and the questions we need answered.

The final itemised quote follows a visit to the house. Decisions on scope, materials and any surprises found during the work have to be taken by you or by someone you trust, so it is worth deciding early who that will be. Our guide on planning a villa renovation covers what to prepare.

What do you not do?

Being clear about limits saves everyone time. We renovate existing houses; we do not build new houses, extensions that need a project, swimming pools or air-conditioning systems, and we do not prepare technical projects, apply for licences or issue energy performance certificates. Those belong to architects, engineers and registered specialists.

Is the garden part of the job?

Only as a finishing touch. Once the building work is over, we can clear overgrown ground, level and prepare beds, repair or replace simple fencing and lay lawn, so the house is handed back in a usable state. We are not landscape designers, and hard landscaping such as paving or concrete is outside this site. Details are on the garden page.

Where on the coast do you work?

From our office in Marbella we work along the western Costa del Sol and the hills behind it. Area pages cover Benahavís, Estepona, Nueva Andalucía, Elviria and Calahonda, and the full list is on our areas page. The housing differs from one urbanisation to the next — detached villas on sloping plots, terraces of townhouses with shared gardens, older houses in the villages — and so does the work.

Where we work

The western Costa del Sol

Our office is in Marbella. We work on villas and houses along the coast from Fuengirola and Mijas to Estepona and Manilva, and inland in Benahavís, Ojén and Istán. If your area is not listed, ask anyway.

Areas →

FAQ

Questions villa owners ask before they start

Do you renovate whole villas or single rooms?

Both. Many jobs start with one room and grow once the visit shows what else needs doing; we tell you what is urgent and what can wait.

Can I get a first estimate from abroad?

Yes. Send photos and the approximate built area by email or WhatsApp and we will reply with a first estimate and our questions.

Do you visit the property before quoting?

Yes, the final itemised quote follows a visit. Roofs, façades and services cannot be priced properly from photos alone.

Is the quote free?

Yes, the estimate and the quote are free and without obligation.

What is an itemised quote?

A quote with each task on its own line, with a description, unit and quantity, plus a clear list of what is excluded.

Who does the electrics and gas?

Authorised partner installers, working under our coordination. You still have one point of contact.

Do you buy the materials?

Yes, we can handle materials purchasing. If you prefer to choose and supply some items yourself, the quote says so.

Is there a final clean?

Yes, a final clean of the house is part of our work before the handover walk-round.

Are you insured?

Yes. We work with a guarantee and public liability insurance (seguro de responsabilidad civil). Guarantee terms are set out in the quote.

Do you install external wall insulation?

Yes, on walls that are sound and suitable. We check the substrate first and explain when it is not the right solution.

Can you tell me how much I will save on energy?

No. Savings depend on the house, the system and how you use it, so we do not quote figures.

Do you repair roof leaks?

Yes, once the cause has been found. Where there are signs of structural movement we recommend a technician first.

Do you replace windows?

Yes, including making good the reveals and sills inside and out. Changing the size of an opening needs separate paperwork.

Do I need a permit for façade or roof work?

Usually some form of notification. Requirements vary by town hall; we go through what usually applies before starting.

Do you apply for licences?

No. We do not prepare technical projects or apply for licences, but we tell you what type of paperwork your scope usually needs.

Do you build pools or extensions?

No. We renovate existing houses and do not build pools, new houses or extensions that need a project.

Is the garden included?

Only as a complement: clearing, levelling, simple fencing and lawn at the end of a job. Paving is handled by a sister site.

Can you work on a townhouse in a community?

Yes. We tell you which parts of the job affect the outside or shared areas so you can clear them with the community first.

What if you find asbestos?

We stop that part of the work. Asbestos-cement removal is done by a registered firm, as explained on retiradauralitamalaga.eu.

How do I get started?

Use the form, message us on WhatsApp or call +34 613 656 443 with photos and the approximate built area.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?